Contact info

Salient Feature:

The brief salient features of the project as described in the PPA documents are;

  1. Project Name: Upper Sanigad Hydro Electric Project (USHEP)
  2. Project Area: Bungal Municipality – 07, Bajhang
  3. Source: Sanigad Khola
  4. Project Type: RoR
  5. Project Capacity: 10.70 MW
  6. Catchment area at HW: 96 km2
  7. Design Discharge: 3.4 m3/sec
  8. Gross Head: 387.60 m
  9. Weir: Length – 25 m , Height – 3 m
  10. Desanding Basin: Length – 50 m , Width – 6 m , Depth – 3 m
  11. Conveyance: Headrace pipe (surface and subsurface) of mild steel pressure pipe of 1875 meter length, 1 .40 meter diameter, 12 mm thickness
  12. Penstock: 1122 meter, diameter 1.2 m and thickness of 8 mm – 20 mm
  13. Powerhouse: The powerhouse is 800 sqm area, Height – 15 meter
  14. Turbine: Horizontal Axis Pelton 2 unit, turbine axis in level of 1261 m elevation.
  15. Generating Units: Two units of 3 phase synchronous Generator of 50 Hz of Frequency and Generation Voltage of 11 KV.
  16. Head Race Tunnel: 2802 m of2.0m x 2.0 m size of the shape of inverted
  17. PPA and Energy: Total annual contract energy of 62. 706740 GWh, 50.165 GWh wet and 12.541 GWh dry
  18. Project Cost NRs 3023 million
  19. Commercial Operation Date: Bhadra 02, 2080